N5 Westport to Turlough Road Project

Project Phase


6 Current:
Construction
7 Next:
Complete
1 Feasibility
2 Option Selections
3 Design & Environmental Evaluation
4 Statuory Process
5 Tendering
6 Construction
7 Complete



Project Description 

The proposed N5 road project stretches from northwest of Westport in the townland of Deerpark East to a point East of Castlebar in the townland of Ballyneggin . The design of the proposed N5 mainline is a Type 2 Dual Carriageway with major junctions proposed at the intersection of the N59, existing N5, N84 and N60. 

The proposed road development includes the following; 

3.7 Kilometres of Type 2 Dual Carriageway 

2.1 Kilometres of Type 2 Single Carriageway 

3 compact grade separated junctions including overbridges 

6 roundabouts 

2 at grade “left in-left out” junctions and 1 all movements at grade junction 

1 bridge widening over the Castlebar River 

2 rail bridges over the Westport to Manulla Junction railway line 

11 overbridges, 2 underbridges and 7 farm underpasses 

Other associated works 

 

Current Project Phase 

 

The project is currently at Phase 6 (Construction) of the TII Project Management Guidelines.  

Construction commenced in January 2020 with the overall project estimated to take 24 months. 

For further information regarding the progress of construction including roadworks updates, news and contact details for the site project partners, please visit the site specific website n5w2t.com. 

 

Note: 

The route corridors shown on this map are for general location purposes only.  They are approximate and do not represent the actual design. 


Contact 

If you have any queries or comments to make in relation to the project, if you require further information or if you wish to make an appointment please contact the following; 

Paul Hyland, 
A/Senior Executive Engineer, 
Mayo National Roads Office, 
Glenparke House, 
The Mall, 
Castlebar, 
County Mayo 

T: (094) 906 4321 
E: phyland@regdesign.com 

 




Project Phase


6 Current:
Construction
7 Next:
Complete
1 Feasibility
2 Option Selections
3 Design & Environmental Evaluation
4 Statuory Process
5 Tendering
6 Construction
7 Complete
Back to top